54 - February 11

  • Feb1107080
    First Day Assembly Worship in our new building.

53 - February 2

  • Feb207047
    Grass growing, draining ditch being completed, floor waxed, baptistry being finished.

52 - December 20

  • Dec2006021
    A newly striped parking lot and an incredible ramp! The stairs were rebuilt from several days ago...weren't in code compliance. Now they are.

51 - December 18

  • Dec1806021
    Handrails, trailer move, cleaning pavement for painting, stairs taken out (why?), and dumpster cube.

50 - December 13

  • Dec1306032
    New grass, trees, dumpster guard, chairs, stairs, ramp, and so much more.

49 - November 30

  • Nov3006068
    Final paving complete. Ramp almost done.

48 - November 29

  • Nov2906060
    Paving almost done! Carpet fully installed. All looks good.

47 - November 27

  • Nov2706027
    Ready to pave...again. Ramp going up. Carpet going down.

46 - November 18

  • Nov1806031
    So close to paving...

45 - November 14

  • Nov1406011
    The night before paving day!

44 - November 13

  • Nov706039
    Most of the lot is ready for paving. If only the rain would stop.

43 - November 7

  • Nov706014
    Unfortunately, rain today so work slowed down. Rain may prevent further work tomorrow. Note rebar that tells the height of the pavement foundation.

42 - November 6

  • Nov60614
    Monday. First layers for under the pavement. Perfect day for work outside. Unfortunately, rain forecast for tomorrow so possible delay in paving this week.

41 - November 4

  • Nov40658
    Some GREAT aerial shots of the property. Work on the dumpster area and ramp area. These may be the LAST pictures of our property prior to paving of the parking lot.

40 - November 1

  • Nov10608
    This place is taking shape from the inside out. See the work beginning on the ramp between the buildings.

39 - October 17

  • Oct1706007
    New canopy going up in the middle of a rain storm.

38 - October 13

  • Oct1306032
    Concrete pour for sidewalks.

37 - October 12

  • Oct1206052
    Electricity, lights, canopy foundation, sidewalk and parking curb forms, and running water!

36 - October 5

  • Oct506068
    Only days away from curbs and paving. Unless rain stops us, this will happen quickly.

35 - September 23

  • Sep2306094
    Major steps toward completion of the facility. Much work beginning outside in preparation for paving, landscaping, and so forth.

34 - September 2

  • Sep206042
    Lots of changes and progress. The little things...

33 - August 19

  • Aug19200625
    Paint inside, the disconnected well, big fans to keep the air clear, bathroom ceilings. So much!

32 - June 25

  • June2529
    On a rainy Sunday, see the sewer connection in neighboring Sheltons Run subdivision, duct work being installed, sheetrock being taped and mudded, and covered ditches and trenches on the property.

31 - June 18

  • Jun1829
    Sewer almost done, much inside work, HVAC going in, connections to the old building.

30 - June 9

  • Jun972
    Major excavation!

29 - June 8

  • Jun620
    The last major excavation is taking place right now, sheetrock is going up, and the roof is now completely covered.

28 - May 28

  • Dsc04822
    New glass doors, lighting in the auditorium area overhead, much more wiring and electrical, funny and suspicious wiring of the telephone/Internet circuit, the arrival of the final pieces of roofing (not yet installed though), and water hookup very soon.

27 - May 21

  • Dsc04544
    Getting ready for today's Ministry Fair, the first official major meeting in our new building expansion.

26 - May 14

  • May1418
    Windows are being installed, much internal wiring, platforms for air handling, more doors installed, and wood for door casings.

25 - May 7

  • May725
    First signs of electrical, window facings are being installed, the faux ceiling mounts are going in, and the place is generally being secured with doors more and more.

24 - April 30

  • Apr3020
    Much inside work. Baptistry has shown up for mounting. Bathroom piping is being secured. Absolutely, the rooms and doors and such are easily seen now.

23 - April 12

  • Dsc04260
    Many more rooms taking form, fire hydrant now permanently in place, roof almost done. It is really starting to look like a building!

22 - April 7a

  • Apr725
    Water line installed, a new fire hydrant, and inside rooms taking shape.

21 - April 7

  • Apr636
    More walls, roof, insulation, water lines, and the final steps of our own fire hydrant.

20 - April 5

  • Apr530
    Walls are going up and the water and sewer line is being trenched along with our very own fire hydrant!

19 - April 4

  • Apr415
    Windows, doors, siding, and the place is beginning to look like home.

18 - April 2

  • Apr216
    One door is up (who will use that?), a backwall panel is up, and a trophy car is demonstrated on the floor.

17 - March 26

  • Mar2627
    The steel is up and the result is something that looks like a big auditorium of some kind. Watch out...still lots of loose pieces and parts on the site.

16 - March 22

  • Mar2201
    The first steel is bolted to the slab. Suddenly, the project takes on a three dimensional aspect as it now rises up from the ground.

15 - March 19

  • Mar1923
    Getting ready for steel!

14 - March 12

  • Mar1217
    Ready for steel! This site looks like a big basketball court (except for the pipes). It looks great.

13 - March 5

  • Mar0515
    Put away for one week under a cover of tarps and plastic, the concrete pour needs to harden, cure, and set with little or no bother. It is this setting process which provides the concrete with its static strength.

12 - March 3

  • Mar030632
    After many months, we now have a building pad! Doesn't all of that smooth, green cement just make you want to take a dive in?

11 - February 25

  • Dsc03929
    Deconstruction! These photos are about the removal of a footer around our building due to incorrect concrete mixtures. The good news is that we are on our way again. (Boy, who is going to carry away all of the rubble?)

10 - February 1

  • Feb115
    Getting ready for the final slab pour.

09 - December 21

  • Dec2127
    Foundation Cut at 2:45PM on Wednesday, December 21, 2005. Other pictures build up to the cut and then depict the additional work around the soon-to-be concrete slab for the new building.

08 - December 16

  • Dec1630
    Some final pictures before the footers are poured...assuming the weather cooperates. This mud hole will quickly turn into our new and very special building. Once the footers are in, the expansion project becomes far less dependent on weather conditions.

07 - November 18

  • Nov1825
    Our building showed up! It is like an Erector set. Probably thousands of parts. It was offloaded about 10AM today. Hard to imagine what it will look like seeing it laying on the ground like this.

06 - November 17

  • Nov17a15
    The heavy equipment is back! And our last and favorite tree stump is now gone, too. Our old front yard is now getting ready for footers and a foundation.

05 - October 15

  • Cleanedup36
    Clean-up and recovery from our flood. Anne and Tonya are our heros! See the carpet being pulled up, the floors being painted, and the moving of all of the downstairs furniture.

04 - October 8

  • Dsc01523
    An attempt to stem the water from flowing into our septic tanks outside. The mud was easily calf-deep. The rain was coming down in sheets!

03 - October 7

  • Oct764
    The first day of our "sewer flood". What a mess! See the damage and clean-up on Friday.

02 - October 5

  • Oct518
    Temporary electrical poles and power is being installed and should be done in several days.

01-September 24

  • Sep2407
    A mysterious hole appeared in the overhead of one of our classrooms. Actually, no mystery at all...just work to find water and sewer pipes.